Hydrolevel CGT450 Series Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Příslušenství pro vodu Hydrolevel CGT450 Series. Hydrolevel CGT450 Series User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 4
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
WARNING To prevent electrical shock or
equipment damage, power must be off during
installation or servicing of the control. To pre-
vent serious burns, the boiler should be thor-
oughly cooled before installing or servicing con-
trol. Only qualified personnel may install or ser-
vice the control in accordance with local codes
and ordinances. Read instructions completely
before proceeding.
The probe may be installed in the boiler above
the lowest safe water level established by the
boiler manufacturer. Most manufacturers pro-
vide a suitable opening in the side of the boiler.
Allow 1/4" clearance from the probe to any boiler
surface, tube or baffle. NOTE: Excessive use of
Teflon tape to seal probe piping threads may
insulate the control from boiler ground. This
could result in the control not operating.
HOW TO INSTALL
1 2 3
5
1/4"
SAFE
WATER
LINE
83 Water Street
New Haven, CT 06511
Phone: (203) 776-0473 FAX: (203) 773-1019
www.hydrolevel.com
Low maintenance. No moving parts to wear stick or hang up,
as in float devices.
Solid state circuitry. Designed for the highest level of perfor-
mance and reliability.
Automatically shuts off burner, after delay, in a low water
condition to prevent dry firing.
Time delay allows water to feed above the probe to a safe
operating level.
INTERMITTENT LEVEL TEST periodically monitors settled
water level for added protection of today’s smaller steam
boilers.
Loosen the two control cover binding head
screws and remove the cover. Assemble the
chassis to the probe flange and secure with the
screws provided with the probe.
Connect the ring terminal wire lead to the probe
terminal stud and secure with the lock washer
and wing nut provided. With the power
removed, proceed with installation and wiring
according to the instructions on page 2. Upon
completion of wiring replace control cover.
4
R E M O T E M O U N T E D M O D E L S O N L Y
A. To secure mounting plate to boiler jacket,* pre-drill two 3/32" pilot holes using the mount-
ing plate as a template. Secure plate with sheet metal screws provided. Attach control to
mounting plate by slipping keyholes in back of chassis over pre-mounted screws on plate.
Tighten screws.
B. Using a wire nut, attach a wire (min 90°C) to the pigtail lead in the control box. Attach the
other end to the probe terminal in the remote probe housing. Attach a second wire between
the ground screw on the control chassis and one of the four screws in the remote probe
housing. Note: Wires and wire nuts not provided.
*Or other suitable surface
BA
Low Water Cut-Offs
For Steam Boilers
120 VAC Operating Voltage
Max. Pressure 15 psi
U.S. Patent Nos. 5,739,504 & 6,390,027
CG450 Series
CGT450 Series
Zobrazit stránku 0
1 2 3 4

Shrnutí obsahu

Strany 1 - HOW TO INSTALL

WARNING – To prevent electrical shock orequipment damage, power must be off duringinstallation or servicing of the control. To pre-vent serious burns,

Strany 2 - MODEL CG450

MODEL CGT450 (for boilers with tankless coil)HOW TO WIREConnect input voltage (120 VAC,60 HZ) to terminals 1 and 2.Connect input voltage (120 VAC, 60

Strany 3 - Model CG450 and CGT450

Operating InstructionsNOTEFor proper low water cut-off operation, the boiler should be cleaned atinitial installation and periodically thereafter. Ref

Strany 4 - FAX: (203) 773-1019

PROBESTest Pressure: 1000 PSI, All ModelsTHE PROBE MAKES THE DIFFERENCEThe probe used in all Hydrolevel controls offersyou distinctive advantages. Unl

Příbuzné modely CG450 Series

Komentáře k této Příručce

Žádné komentáře